Drill String Components includes a kelly, drill pipe, drill collars, stabilizers joints and various other accessories. Role is to play the next drill, transmitting mechanical energy needed to break the rock drill to drill the bottom hole pressure is applied to the well flushing fluid delivery and conduct other underground operations. Drilling stabilizers is also called centralizer, the BHA in the lower part of the drill string connected to prevent deviation or drill directional wells, and is conducive to drill smooth operation. Shock absorber for absorbing shock and vibration generated drilling load, in order to improve the life of the drill bit and other drilling tools.
Any hole drill mounted on a common, can easily be round, square, triangle hole, lines, curves on the copper, iron, stainless steel, glass and other sheet metal plane, sphere and other cutting any surface
2015年10月3日星期六
2015年9月30日星期三
Down hole drilling tools classification
Down hole drilling tools classification: drill is a major and essential part of the drill string, its main role is to transfer torque delivery during drilling
mud and constantly connected to the drill string in order to achieve longer continue to raise deep eyes purpose. Drill collars located in the drill bit and drill hole assembly or worsen between the drill pipe, drill main role is to provide control WOB and inclination,drill collars are generally made by high alloy steel forging.
2015年9月27日星期日
Hole opener drilling
Hole opener drilling include: kelly, drill pipe, heavy weight drill pipe, drill collars, adapters, drill stabilizer, downhole drilling, shock absorbers, drill and so on. And these downhole tool string connected together to form a tube called the drill string. The drill string is ground and underground communication hub. Drilling, power transmission and conveying surface drilling, relying drillstring to achieve; complex situations change formations, underground, can be reflected through the drill string to the ground; in addition to other jobs in the drilling process, such as coring processing downhole accident, midway test and so must rely on the drill string to achieve.
2015年9月24日星期四
OCTG tubing is mainly used to transport oil, gas well drilling and oil and gas
OCTG tubing is mainly used to transport oil, gas well drilling and oil and gas. It includes oil drill pipe, casing, tubing pumping. Oil Drill Pipe used to connect the drill collar and drill bit and drilling power transfer. Oil casing is mainly used to support the rear of the wall during drilling and completion, and after completion to ensure the normal operation of the entire drilling process wells. The main pipeline pumping oil at the bottom of the oil and gas transport to the surface.
2015年9月21日星期一
Tubing coupling is an oil drilling tool
Tubing coupling is an oil drilling tool, mainly for tubing connections. Pipe couplings mainly to solve the existing coupling due to fatigue fracture prone to stress concentration problems.
Tubing coupling structures are: tubing ends and the inner wall of the coupling connected to the tapered threads, ends with the tubing coupling body with the same thread pitch flat with threaded connect. Relieving single tapered threaded pipe connection male thread root stress concentration features, easy to produce fatigue fracture, good connection effect. Effectively prevent the oil well tubing string broken off accident.
Coupling into tubing coupling and casing couplings. Commonly used steel grade J55, K55, N80, L80, P110 and so on.
Tubing coupling structures are: tubing ends and the inner wall of the coupling connected to the tapered threads, ends with the tubing coupling body with the same thread pitch flat with threaded connect. Relieving single tapered threaded pipe connection male thread root stress concentration features, easy to produce fatigue fracture, good connection effect. Effectively prevent the oil well tubing string broken off accident.
Coupling into tubing coupling and casing couplings. Commonly used steel grade J55, K55, N80, L80, P110 and so on.
2015年8月28日星期五
Opening device on the market a wide AISI 4142 Sucker rod variety of species, hole different substrates, sharp teeth the effective cutting is very different, prices vary. At the time of purchase opening, generally we need to consider several factors, and try to find a balance between price and performance, while providing the best cost advantage, quality assurance process and productivity of parts.
(1) consider the number of holes to be machined
A common misconception is: carbide hole saw is always the best choice for the matrix material. High-performance carbide drill drilling can provide the highest rate and the shortest processing cycle. However, if the small number of machined hole, and the workpiece material is thin, low hardness, can be relatively inexpensive bimetal hole may be more cost advantages.
(2) Consider aperture size
Carbide drill bit diameter greater AISI 4145H Hole opener than 12mm expensive, but encountered stiff material, bimetal hole saw is not durable, how to do? Optional carbide hole saw, carbide hole saw, sharp teeth welded alloy made with good abrasion resistance temperature resistance.
(1) consider the number of holes to be machined
A common misconception is: carbide hole saw is always the best choice for the matrix material. High-performance carbide drill drilling can provide the highest rate and the shortest processing cycle. However, if the small number of machined hole, and the workpiece material is thin, low hardness, can be relatively inexpensive bimetal hole may be more cost advantages.
(2) Consider aperture size
Carbide drill bit diameter greater AISI 4145H Hole opener than 12mm expensive, but encountered stiff material, bimetal hole saw is not durable, how to do? Optional carbide hole saw, carbide hole saw, sharp teeth welded alloy made with good abrasion resistance temperature resistance.
2015年8月25日星期二
During the construction of the system, hole opener drilling buried crossing point and allow the excavation site exploration holes, in order to ensure that no damage to other pipelines.
2, the selection and preparation of drilling mud
Drilling mud is an important part of the selection and preparation of horizontal directional crossing, is to drill pilot holes pre-reaming and pullback pipe when the "blood."
The main effect of 2.1 for cooling drilling mud hole, carry the drill cuttings and discharge the ground,
Stabilizing the cell walls and reduce torque Hydraulic Drilling jars and pull back when drilling.
2.2 The performance parameters of density, viscosity and bond strength, control the density prevents hole wall collapse, and the size of the drilling mud viscosity decided takeaway chip capacity, bond strength is a measure of drilling mud solid particles in suspension Ability. Only when these three parameters adjusted to an appropriate range, drilling mud to play the biggest role.
2, the selection and preparation of drilling mud
Drilling mud is an important part of the selection and preparation of horizontal directional crossing, is to drill pilot holes pre-reaming and pullback pipe when the "blood."
The main effect of 2.1 for cooling drilling mud hole, carry the drill cuttings and discharge the ground,
Stabilizing the cell walls and reduce torque Hydraulic Drilling jars and pull back when drilling.
2.2 The performance parameters of density, viscosity and bond strength, control the density prevents hole wall collapse, and the size of the drilling mud viscosity decided takeaway chip capacity, bond strength is a measure of drilling mud solid particles in suspension Ability. Only when these three parameters adjusted to an appropriate range, drilling mud to play the biggest role.
2015年8月22日星期六
Reaming Construction Technology
(1) Dual Drilling coordinate operations hole opener drilling in and out of the soil point, each with a bench
Machines, one to provide torque, providing a pulling force to avoid long drill
Reamer cause loss of control, reducing the risk of reaming construction of mention
High speed reaming.
(2) high hardness rock reaming the pilot hole after construction is completed in the first
The first was high hard reaming, application engineered hard rock section of 370 m
Reaming process of rock in the rock section with palm-style closely spaced cones reaming
Implement multiple pre-reaming.
(3) The change is completed to drill reaming Rocks, exit the rock expand
Hole device, the reaming drill rock excavated from the point when pulled, on a subsequent drilling
Replace the drill direction lever, CLAY segment reaming.
(4) Multiple reaming reaming construction, mud flowback carry long distance
With sediment, the flow resistance is large, the effect is clear holes or wash hole is not ideal,
The effective size of the hole caused by roller reamer drilling a relative decrease in the underground ring. Using multiple expansion
Hole cutter each cutting down the soil with respect to circulation of cuttings
The mud, the desired reduction in emissions back, so it does not make
Into the hole blockage, the effective size of the annular space has been fully guaranteed.
Concrete construction, in paragraph rock and clay in a total of seven times reaming,
Effectively reduces the resistance of the reamer and shorten the reaming cycle.
(1) Dual Drilling coordinate operations hole opener drilling in and out of the soil point, each with a bench
Machines, one to provide torque, providing a pulling force to avoid long drill
Reamer cause loss of control, reducing the risk of reaming construction of mention
High speed reaming.
(2) high hardness rock reaming the pilot hole after construction is completed in the first
The first was high hard reaming, application engineered hard rock section of 370 m
Reaming process of rock in the rock section with palm-style closely spaced cones reaming
Implement multiple pre-reaming.
(3) The change is completed to drill reaming Rocks, exit the rock expand
Hole device, the reaming drill rock excavated from the point when pulled, on a subsequent drilling
Replace the drill direction lever, CLAY segment reaming.
(4) Multiple reaming reaming construction, mud flowback carry long distance
With sediment, the flow resistance is large, the effect is clear holes or wash hole is not ideal,
The effective size of the hole caused by roller reamer drilling a relative decrease in the underground ring. Using multiple expansion
Hole cutter each cutting down the soil with respect to circulation of cuttings
The mud, the desired reduction in emissions back, so it does not make
Into the hole blockage, the effective size of the annular space has been fully guaranteed.
Concrete construction, in paragraph rock and clay in a total of seven times reaming,
Effectively reduces the resistance of the reamer and shorten the reaming cycle.
2015年8月19日星期三
Drill pilot holes synchronous dual docking Construction Technology
Using the international advanced double Drill pilot holes sync dock construction
Technology, for the first time successfully implemented unearthed point, buried at both ends Double Diamond
Machine synchronized operation to solve the long hole opener drilling distance through the guide hole in Construction
Drill instability and lack of strength and other problems. Foreign fishing island island through the booklet
Engineering Dual Drill pilot holes sync dock construction technology as follows.
(1) The electromagnetic coil is arranged on the outer island fishing shallow, brochures island side
Rig maintaining low-speed rotation, the use of control to the system will drill to the point unearthed
Drilling approximately 2 200 m, wait and unearthed buried point to point auxiliary rig
Drilling bits for docking.
(2) The special fishing hook mounted on the rig side of the outer fishing island,
Under the guidance of steering systems crossover drilling will salvage hook drilled into the specified location.
(3) foreign fishing island and brochures island keeps rotating rig, fishing hook fishing
After the outer side of the island to catch the drill pipe, drilling rig stopped booklet Island side, the drill bit
Pulling out of the ground. Measuring the deviation is mainly based on two rigs guide
Relative to the measured sensor, the sensor according to the parameters measured, calculated
Azimuth deviation and relative distance between the drill pipe, and gradually adjusted to eliminate bias
Poor, to salvage two drill docking.
(4) designed in accordance with the curve through the external side of the guide hole fishing island
Adjust (i.e. repair hole), thereby completing the construction of the entire guide hole.
Using the international advanced double Drill pilot holes sync dock construction
Technology, for the first time successfully implemented unearthed point, buried at both ends Double Diamond
Machine synchronized operation to solve the long hole opener drilling distance through the guide hole in Construction
Drill instability and lack of strength and other problems. Foreign fishing island island through the booklet
Engineering Dual Drill pilot holes sync dock construction technology as follows.
(1) The electromagnetic coil is arranged on the outer island fishing shallow, brochures island side
Rig maintaining low-speed rotation, the use of control to the system will drill to the point unearthed
Drilling approximately 2 200 m, wait and unearthed buried point to point auxiliary rig
Drilling bits for docking.
(2) The special fishing hook mounted on the rig side of the outer fishing island,
Under the guidance of steering systems crossover drilling will salvage hook drilled into the specified location.
(3) foreign fishing island and brochures island keeps rotating rig, fishing hook fishing
After the outer side of the island to catch the drill pipe, drilling rig stopped booklet Island side, the drill bit
Pulling out of the ground. Measuring the deviation is mainly based on two rigs guide
Relative to the measured sensor, the sensor according to the parameters measured, calculated
Azimuth deviation and relative distance between the drill pipe, and gradually adjusted to eliminate bias
Poor, to salvage two drill docking.
(4) designed in accordance with the curve through the external side of the guide hole fishing island
Adjust (i.e. repair hole), thereby completing the construction of the entire guide hole.
2015年8月16日星期日
After the completion of the pilot hole, hole opener drilling the drill holes should be extended to the appropriate pipe diameter to facilitate the installation finished, a process known as pre-reaming, (depending on the pore size of the final decision reaming times). Typically, the rig across the reamer is connected to the drill pipe, then dragged by the rig rotated back to the guide hole, the guide hole to expand,Platform Drilling Robot but to a lot of mud pump into the borehole, drilled in order to ensure the integrity and non-landslides, debris and cut back under the ground.
2015年8月13日星期四
After the pre-reaming is complete, hole opener drilling you can drag the finished drill pipe. Pipe prefabrication should be done on the side opposite the rig. Reaming drill connect the other end to end through the rotary joint on the finished pipe. Finished pipe along the rotary joint to avoid rotating reamer to ensure its smooth drag drilling. Pullback completed by the drilling rig, the process also requires a lot of mud with Platform Drilling Robots dragging back reaming process should be continued until the finished product pipeline and emerged from the side of the rig.
2015年8月10日星期一
"T tooth" drill is our scientific and technical coil tubing drilling rig personnel to develop new products first domestic. Its features are as follows:
After a drill before using lip surface is flat, use a back order, lip surface is formed concentric teeth (grooved).
2, a conventional concentric concentric tooth tooth bit once polished, then lost the advantage and ordinary flat teeth as concentric drill performance. But "T tooth" wear diamond drill along with the active layer can be gradually deepened tooth concentric grooves, until the work is completed wear layer, and always maintain the advantages of concentric teeth.
3, the drill can be formed concentric teeth, broken rocks ahead, forming a plurality of free surface, both the drill roller reamers drilling grinding and crushing, vibration broken rock, resulting in relatively coarse-grained rock powder, greatly improve the drilling efficiency. According to several experiments situation showed an increase of about 100 percent over the same drill, especially for hard drilling slipping formation.
4, can reduce the radial drill swing, improve drilling stability, oriented to prevent hole inclination, to reduce the impact of the diamond, enhancing penetration ability.
After a drill before using lip surface is flat, use a back order, lip surface is formed concentric teeth (grooved).
2, a conventional concentric concentric tooth tooth bit once polished, then lost the advantage and ordinary flat teeth as concentric drill performance. But "T tooth" wear diamond drill along with the active layer can be gradually deepened tooth concentric grooves, until the work is completed wear layer, and always maintain the advantages of concentric teeth.
3, the drill can be formed concentric teeth, broken rocks ahead, forming a plurality of free surface, both the drill roller reamers drilling grinding and crushing, vibration broken rock, resulting in relatively coarse-grained rock powder, greatly improve the drilling efficiency. According to several experiments situation showed an increase of about 100 percent over the same drill, especially for hard drilling slipping formation.
4, can reduce the radial drill swing, improve drilling stability, oriented to prevent hole inclination, to reduce the impact of the diamond, enhancing penetration ability.
Guide hole is in a horizontal direction at hole opener drilling a predetermined angle and drilling holes in a predetermined cross-section, including a straight slash and some large radius arc. Drill pilot holes at the same time, the contractor may choose and use larger diameter drill (ie irrigation tube) to shield the guide rod. Rinse the catheter tube may play a similar role, can also facilitate retracting the guide rod and replace the drill bit and so on. Direction of the guide hole is controlled by a controller located at the rear end of the drill pipe within the drill bit (called bent housing) is completed. Drilling during the drill is not rotating If you need a change of direction bent housing right position, bore path that is right along a smooth curve forward. Drilling curves by placing the rear end of the drill pipe in the drill of the electronic direction finder is measured and then the results transmitted to the surface of the receiving device, the data is processed and calculated in digital form displayed on the screen, the electron means primarily intended for monitoring the relationship crossover drilling between the drill pipe and the earth's magnetic field and the inclination (bit three-dimensional coordinates in the ground), the measured data are compared with the design data, to determine the deviation of the actual position and the design position of the drill, and the deviation value within an allowable range, and so on until the drill pilot holes in accordance with a predetermined curve unearthed at a predetermined position.
2015年8月6日星期四
Mainly for geological prospecting in complex formation drill collars manufacturers drilling practical problem. To achieve technological breakthroughs hole expansion pipe, prospector team technical staff after dozens of simulations and field tests, just more than a year we have obtained a lot of new progress, especially in Lujiang - Zongyang National assembled exploration area iron copper water exploration drilling rig encountered swelling, weakness, loose ground test, only half a day to complete the formation of the control section, so that the original drilling process pump pressure drops to normal levels from exceeding 60%. Currently, the project research results, geological core drilling with hydraulic alarm hydraulic tube expander,AISI 4145H Hole Opener hydraulic alarm tandem drilling reamer and hydraulic anti-de-expander tube into devices, has received three national patents.
2015年8月2日星期日
(1) According to the test requirements, select the Drilling Stabilizers manufacturers appropriate field, and the rig is securely installed.
(2) large diameter drill bit to a predetermined test depth. Remove the core, will be described.
(3) with polished polished drill hole bottom, hit the bell with a cone drill.
(4) drill bit with a small aperture test hole, big hole coaxial requirements, remove the core described 50cm deep; when the hole wall is not smooth, diamond reamer reaming should be used; when Forging roller reamer the core breaker should be repeated (2) (3) step, until you find the complete core position.
(5) cleaning the test hole, and the hole wall is dried.
(2) large diameter drill bit to a predetermined test depth. Remove the core, will be described.
(3) with polished polished drill hole bottom, hit the bell with a cone drill.
(4) drill bit with a small aperture test hole, big hole coaxial requirements, remove the core described 50cm deep; when the hole wall is not smooth, diamond reamer reaming should be used; when Forging roller reamer the core breaker should be repeated (2) (3) step, until you find the complete core position.
(5) cleaning the test hole, and the hole wall is dried.
2015年7月31日星期五
Hole hole saw (hole saw) as walking beam pumping units he serrated material classification: the bimetal hole saw, carbide hole saw, diamond hole saw,, tungsten carbide hole saw, different materials for cutting materials is not the same, the most common is Downhole Stabilizers double metal hole, we recommend the use of a harder metal material carbide hole saw, glass, carbon fiber, ceramics and other pieces of fissile material recommended diamond hole saw.
2015年7月27日星期一
Hole is also known as hole saw or Drill Pipe in stock hole saws, modern industrial or engineering refers to the processing of a circular hole cutting class Special saws, hole with different pore sizes and specifications according to the circle of different sizes, but also with at different depths of the openings, we divided into standard openings and deep carrier-type hole saw two,drilling crossover subs it installed in the hand drill, impact drill, radial drill and other power tools, simple and flexible, easy to carry , safe, and versatile.
2015年7月23日星期四
Practices
1, the opening piece in front of the opening, the first hole with a flashlight hit Approach of 11.5mm.
2, the piston rod, screwed into Casing and tubing manufacturersa threaded hole in the piston cylinder and piston rod gasket set into another set into the die. A piston rod inserted into the hole and then approaches the workpiece, the final screwed into the punch, so that the knife-edge and the machined surface closely punch, punch, the workpiece, the die three reliable fixed.
3, in a forward direction in the needle shut cutting back oil, then repeatedly press the press urging the handle Premium Connection Coupling so that the piston pump starts working on the hydraulic length, increasing shear forces between the convex mold, die cut holes in the workpiece until the cut pass so far.
4. Loosen the oil return by cutting, the hydraulic uninstall all. After the case of the four-step procedures to complete the hole operations.
5. Remove the punch, remove the die plate in the hair, Kai net open mold.
1, the opening piece in front of the opening, the first hole with a flashlight hit Approach of 11.5mm.
2, the piston rod, screwed into Casing and tubing manufacturersa threaded hole in the piston cylinder and piston rod gasket set into another set into the die. A piston rod inserted into the hole and then approaches the workpiece, the final screwed into the punch, so that the knife-edge and the machined surface closely punch, punch, the workpiece, the die three reliable fixed.
3, in a forward direction in the needle shut cutting back oil, then repeatedly press the press urging the handle Premium Connection Coupling so that the piston pump starts working on the hydraulic length, increasing shear forces between the convex mold, die cut holes in the workpiece until the cut pass so far.
4. Loosen the oil return by cutting, the hydraulic uninstall all. After the case of the four-step procedures to complete the hole operations.
5. Remove the punch, remove the die plate in the hair, Kai net open mold.
2015年7月19日星期日
Applications "pressurized pipeline opening" on construction,Sucker rods with molded guide the first line in charge of welding flange mounted on the valve. "Pressure pipeline HOLE" is mounted on the valve, through the opening in the competent punch line.
After the punch, close the valve, remove "pressurized pipeline hole saw," Wang line 45 wells by bolting to the valve can be. The whole process without spillage, less than ten minutes.
The invention as compared with conventional construction methods is to install a multi-valve, pipeline welding to Sucker rod pump unit controller change the past, did not affect the production rate and yield when a single well, providing for the oil and gas pipeline risk management, incident handling, environmental pollution control in the new technology options.
After the punch, close the valve, remove "pressurized pipeline hole saw," Wang line 45 wells by bolting to the valve can be. The whole process without spillage, less than ten minutes.
The invention as compared with conventional construction methods is to install a multi-valve, pipeline welding to Sucker rod pump unit controller change the past, did not affect the production rate and yield when a single well, providing for the oil and gas pipeline risk management, incident handling, environmental pollution control in the new technology options.
2015年7月15日星期三
Used opening, we have to clean up, first Downhole Drilling Stabilizers manufacturers of all we want to control the entire hole disassembled, clean the inside, the inside left of litter cleaned, and then Casing and tubing manufacturers the hole is installed, after installation is complete wipe clean the surface after the hole is placed in an environment suitable for storage. After the cutter is mounted on the known drill hole can be cut in any arbitrary surface plane Spherical Casing and tubing collar Gas tight connection copper, iron, stainless steel, glass and other sheet. Flexible, convenient and secure.
2015年7月12日星期日
AISI4145H steel drill Non magnetic drill collar collar is a high strength, high hardness, resistance to twisting, bending, anti-wear special alloy steel, mainly for the G105,S135 drill pipe manufacturers manufacturing 1000-3000 meters deep underground working oil pump tubing outer sleeve in the domestic oil and gas industry are widely used. Since AISI4145H steel drill collars belonging to high-tech products with high added value, and with the continuous development of China's oil API Spec 5CT oil tubing pup joint in stock and gas industry, the market demand for larger, major steel companies are competing to seize the market, product competition is more intense.
2015年7月9日星期四
Oil drilling Yan steel, do HWDP overall L8013Cr Pup joint manufacturers HWDP raw steel is AISI 4145H alloy steel, the production process strictly enforce the SY / T5146-1997 standard, heavy weight drill pipe is a medium-weight, similar to drill drill rod, drill pipe wall thickness than the large than small drill collars, drill pipe J55,N80,C95,T95,P110 Casing and tubing in stock connected to a particular extension connector on its thick-walled tube, usually in the composition of the drill string is applied between the drill pipe and drill collars, prevent sudden changes in cross-section of the drill string, the drill pipe to reduce fatigue. Use in directional wells, high-speed drilling with lower torque, reducing wear and Oil Country Tubular Goods(OCTG) Pup joint tear of the drill string, due to its steel drill collars than small, and wall contact area is small, not easily formed pressure card diamond.
2015年7月5日星期日
Hydraulic opening device is simple, effort, speed,Spray metal sucker rod coupling processing surface smooth and clean, but also from the site, the position limits can be used, safe and reliable. Hydraulic opening device structure lightweight, attractive, and easy to carry, for the metallurgical, oil, chemicals, electronics, electrical appliances, shipbuilding, machinery and other industries pipeline API 7-1 Spec installation and maintenance of wires, lights, instrumentation switches and other openings, more suitable for the shaped instrument panel floor and wall openings of the switch box with a sub-line electrical box.
订阅:
博文 (Atom)